Quest V6-3.5L (VQ35DE) (2009)
INSPECTION AFTER INSTALLATION
-
Before starting engine, check the levels of engine coolant, engine oil and working fluid. If less than required quantity, fill to the specified level.
-
Use procedure below to check for fuel leakage.
-
Turn ignition switch ON (with engine stopped). With fuel pressure applied to fuel piping, check for fuel leakage at connection points.
-
Start engine. With engine speed increased, check again for fuel leakage at connection points.
-
Run engine to check for unusual noise and vibration.
-
Warm up engine thoroughly to make sure there is no leakage of engine coolant, engine oil, working fluid, fuel and exhaust gas.
-
Bleed air from passages in pipes and tubes of applicable lines, such as in cooling system.
-
After cooling down engine, again check amounts of engine coolant, engine oil and working fluid. Refill to specified level, if necessary.
-
Summary of the inspection items: