nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Procedures|Page 3811 > < Procedures|Page 3809
Page 8
background image

NOTE:
To ease installation, first remove the A/C support clip from the lower section high/low pressure pipe and secure it to the dash panel threaded stud.
2. Install the new upper high/low pressure pipe through the engine compartment.

a. Install the high/low pressure pipe to the front expansion valve and only hand tighten the connector bolt (1) as shown.

-

Air cleaner to electric throttle control actuator tube (2)

-

Electric throttle control actuator (3)

-

Arrow Indicates Front

b. Hand tighten the fittings between the upper and lower high pressure pipe (A) and the low pressure pipe (B) as shown.

-

Arrow Indicates Front

c. Hand tighten the high pressure pipe connection (1) and low pressure pipe connection (2) located near the RH front suspension strut tower (3)

as shown.

d. Install the A/C pipe clamp bolt (A) to the RH front suspension strut tower (3) as shown.
e. Attach the high/low pressure pipe to the A/C support clip (secured to the dash panel threaded stud).
f.

Tighten the high pressure pipe connection (1) and low pressure pipe connection (2) located near the RH front suspension strut tower (3) as
shown to specification.

3. Complete the installation of the lower high/low pressure pipe.

CAUTION:
-

Clean all of the A/C pipe fittings and connections.

-

Replace the O-rings of the high/low-pressure pipe with new ones.

-

Lubricate all the O-rings with the specified A/C system oil.

Procedures|Page 3811 > < Procedures|Page 3809