nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Positive Crankcase Ventilation|Page 2212 > < Positive Crankcase Ventilation|Page 2210
Page 1
background image

Positive Crankcase Ventilation: Testing and Inspection
Power Supply And Ground Circuit

POWER SUPPLY AND GROUND CIRCUIT

Diagnosis Procedure

1.INSPECTION START
Start engine.
Is engine running?
Yes or No
Yes >>GO TO 8.
No >>GO TO 2.

2.CHECK ECM POWER SUPPLY CIRCUIT-I
1. Turn ignition switch OFF and then ON.

2. Check voltage between ECM terminal 109 and ground with CONSULT-III or tester.

Voltage: Battery voltage

OK or NG
OK >>GO TO 4.
NG >>GO TO 3.

3.DETECT MALFUNCTIONING PART
Check the following.
-

Fuse block (J/B) connector E30

-

10 A fuse

-

Harness for open or short between ECM and fuse

>>Repair harness or connectors.

4.CHECK GROUND CONNECTIONS
1. Turn ignition switch OFF.
2. Loosen and retighten three ground screws on the body. Refer to See: Computers and Control Systems/Testing and Inspection/Component Tests

and General Diagnostics/Power Supply And Ground Circuit.

Positive Crankcase Ventilation|Page 2212 > < Positive Crankcase Ventilation|Page 2210