Quest Minivan SE V6-3.3L (VG33E) (1999)
![background image](/nissan/quest_minivan_se/v6-3.3l_(vg33e)/Page-502005.png)
Installation
CAUTION:
^
Do not bend or twist timing belt. After removing timing belt, do not turn crankshaft and camshaft separately because valves will strike piston
heads.
^
Make sure that timing belt, camshaft sprocket, crankshaft sprocket and belt tensioner are clean and free from oil and water.
^
Installation should be carried out when engine is cold.
1. Confirm that No. 1 piston is set at TDC on its compression stroke.
2. Install tensioner and tensioner spring.
Once stud is removed, apply locking sealant to threads of stud on cylinder block side before Installing.