Rogue 2WD L4-2.5L (QR25DE) (2008)
Battery Cable: Service and Repair
BATTERY TERMINAL WITH FUSIBLE LINK
Exploded View
Exploded View PG-89
Removal and Installation
REMOVAL
1. Disconnect the battery cable from the negative terminal.
2. Remove cover of battery positive terminal.
3. Remove harness mounting nut (1) to disconnect harness connectors (2).
4. Remove fusible link holder mounting nut (3) to disconnect battery terminal with fusible link (4).
INSTALLATION
Install in the reverse order of removal.
Harness mounting nut Torque: 13.2 N.m (1.3 kg-m, 10 ft-lb)
Fusible link holder mounting nut Torque: 13.2 N.m (1.3 kg-m, 10 ft-lb)