nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Customer Interest for Wiring Harness: > < A/T - Harsh 1-2 Shift/DTC P0745 Stored|Page 7867
Page 9
background image

10.

Reinstall the bolt and small bracket that holds the ground terminal.

^

Tighten to 6.9 - 8.8 N.m (0.7 - 0.9 Kg-m, 61-78 in-lb)

11.

Reinstall all other parts removed as per the appropriate Service Manual (ESM).

^

Make sure to use new oil pan bolts (listed in the Parts Information).

^

DO NOT re-use the old oil pan bolts.

12.

Using CONSULT-II, erase all DTC's.

13

.Test-drive to confirm the incident is fixed.

Disclaimer

Customer Interest for Wiring Harness: > < A/T - Harsh 1-2 Shift/DTC P0745 Stored|Page 7867