Sentra GXE L4-1.8L (QG18DE) (2000)
^
This will add the selected data to the "File(s) Selected list.
4. Click on "Continue" and follow directions to perform "data transfer" (download) from ASIST into CONSULT-II.
Step Two: Preparation for Reprogramming ECM
1. Connect a battery charger to the vehicle's battery.
^
Set the charger to a low charger rate (trickle charge).
CAUTION:
DO NOT connect the CONSULT-II AC power supply for items 2 and 3.
2. Press [SUB MODE] (see Figure B) then:
a. From the listed items, find and select [BATTERY CHARGE].
3. Check the CONSULT-II's "Charger Input" reading (see Figure C).
NOTE:
^
"Battery Voltage" is the voltage level of CONSULT-II's battery.
^
"Charger Input" is the voltage level of the vehicle's battery. (It must be above 12 volts.)
Step Three: Reprogram the Vehicle ECM
Step Four: Erase DTC's
^ Use CONSULT-II and the Diagnostic (red/white) Card to check and erase any DTC's that may have stored during the reprogramming procedure.