nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Control Valve Assembly and Accumulators|Page 6495 > < Control Valve Assembly and Accumulators|Page 6493
Page 7
background image

b. Attach O-rings and install 3-unit solenoids assembly onto upper body.
c. Attach O-ring and install line pressure solenoid valve onto upper body.

3. Tighten all bolts.

Control Valve Assembly and Accumulators|Page 6495 > < Control Valve Assembly and Accumulators|Page 6493