nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Engine Controls - MIL ON/DTC P1444 Set|Page 6851 > < Engine Controls - MIL ON/DTC P1444 Set|Page 6849
Page 11
background image

21.

After about one minute has passed, check the CONSULT-II's battery voltage reading on the CONSULT-II screen (see Figure 16).

NOTE:

CONSULT-II's battery voltage is called "BATTERY VOLTAGE".

A.

If CONSULT-II's battery voltage ("Battery Voltage") is less than 8 volts:

^

Turn OFF CONSULT-II

^

Charge the CONSULT-II battery before proceeding with ECM Reprogramming

OR

^

Connect the AC/DC power supply cord to CONSULT-II during the reprogramming procedure.

B.

If CONSULT-II's battery voltage ("Battery Voltage") is more than 8 volts, proceed with the following step.

CAUTION:

Do not attempt ECU Reprogramming if the CONSULT-II battery voltage is below the specified voltage. Permanent ECU damage can occur if the
battery does not maintain the minimum voltage during the ECU Reprogramming.

Step 2a: Confirm Vehicle Battery Voltage

22.

Connect CONSULT-II to the vehicle making sure the connector is fully plugged in.

23.

Turn the ignition switch ON (DO NOT start the vehicle).

24.

After about one minute has passed, check the vehicle's battery voltage reading on the CONSULT- II screen (see Figure 17).

NOTE: 

The vehicle's battery voltage is called "Charger Input".

Engine Controls - MIL ON/DTC P1444 Set|Page 6851 > < Engine Controls - MIL ON/DTC P1444 Set|Page 6849