nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Control Valve Assembly and Accumulators|Page 7255 > < Control Valve Assembly and Accumulators|Page 7253
Page 9
background image

f.

Temporarily assemble lower and upper bodies, using reamer bolt as a guide. 
Be careful not to dislocate or drop steel balls, orifice check spring, orifice check valve and pilot filter.

g. Install and temporarily tighten bolts and tube brackets in their proper locations.

2. Install solenoids.

a. Attach O-ring and install torque converter clutch solenoid valve and side plates onto lower body.

b. Attach O-rings and install 3-unit solenoids assembly onto upper body.
c. Attach O-ring and install line pressure solenoid valve onto upper body.

3. Tighten all bolts.

Control Valve Assembly and Accumulators|Page 7255 > < Control Valve Assembly and Accumulators|Page 7253