Xterra XE 4WD V6-3.3L SC (VG33ER) (2002)
Loading Procedure
NOTE:
-
The CONSULT-II must be used in conjunction with a program card. CONSULT-II does not require loading (Initialization) procedure.
-
Be sure the CONSULT-II is turned off before installing or removing a program card.
Consult-II Data Link Connector (DLC) Circuit
Inspection Procedure
How to Check Terminals
Connector and Terminal Pin Kit
Use the connector and terminal pin kit listed below when replacing connectors or terminals.