plymouth Workshop Repair Guides

Plymouth Workshop Service and Repair Manuals

Recall - Powertrain Control module|Page 2697 > < Recall - Powertrain Control module
Page 2
background image

Models: 1995 Model Year Plymouth/Dodge Neon (PL) Vehicles Built Through February 1, 1994, (MDH 02-01-XX)

Service Requirement Summary:

PCM AND BATTERY BOLT/STUD REPLACEMENT:

1.

Disconnect the negative battery terminal.

2.

Disconnect the positive battery terminal, then remove and discard the bolt/stud assembly. Install the new positive battery terminal bolt/stud and
torque starter cable eyelet nut to 105 +/- 15 lb-in. (Figure 1).
Note:
Align the flats of the starter cable eyelet terminal with flats on bolt. Do not reinstall battery terminal onto battery post until step 11.

Recall - Powertrain Control module|Page 2697 > < Recall - Powertrain Control module