plymouth Workshop Repair Guides

Plymouth Workshop Service and Repair Manuals

Wheel Bearing > < Trailing Arm Bushing|Removal|Page 4281
Page 3
background image

raise the vehicle to the correct curb height at the top of the jounce cycle.

15. Jounce the front and rear of the vehicle several times to allow the vehicle to settle at its correct curb height.
16. Torque the shock absorber upper mounting bolt to 162 Nm (120 ft. lbs.).
17. Torque the shock absorber lower mounting bolt to 162 Nm (120 ft. lbs.).
18. Tighten the trailing link to frame bracket mounting bolt to a torque of 108 Nm (80 ft. lbs.).
19. Tighten the trailing link to knuckle mounting bolt to a torque of 163 Nm (120 ft. lbs.).

Wheel Bearing > < Trailing Arm Bushing|Removal|Page 4281