pontiac Workshop Repair Guides

Pontiac Workshop Service and Repair Manuals

Sensors and Switches - HVAC > < HVAC - Manual|Page 15395
Page 2
background image

Notice:  Refer to Fastener Notice.

2. Tighten the blower motor control processor screws.

Tighten the screws to 1.5 N.m (13 lb in).

3. Install the blower motor control processor wire harness connector.
4. Install the right closeout panel.

Sensors and Switches - HVAC > < HVAC - Manual|Page 15395