G6 V6-3.6L (2007)
Tighten the sensor to 42 N.m (31 lb ft).
3. Lower the vehicle.
4. Connect the engine wiring harness electrical connector (2) to the HO2S electrical connector (1).
5. Install the engine wiring harness HO2S electrical connector clip to the engine harness.
6. Install the CPA retainer (5) to the HO2S electrical connection.
7. Install the fuel injector sight shield.