pontiac Workshop Repair Guides

Pontiac Workshop Service and Repair Manuals

Grounding Point > < Diagram Information and Instructions|Page 13576
Page 5
background image

4. Install the junction block connector cover.
5. Turn the junction block right side up.
6. Install the junction block to the battery tray by pushing the electrical center into the retainer tab.
7. Install all of the fuses and the relays.
8. Install the positive battery cable lead to the stud on underhood junction block, then install the positive battery cable lead retaining nut.

Tighten the positive battery cable lead retaining nut to 10 N.m (89 lb in).

9. Install the relay cover.

10. Connect the negative battery cable.

Grounding Point > < Diagram Information and Instructions|Page 13576