G6 V6-3.9L (2009)
5. Install the communication interface module. Refer to Communication Interface Module Replacement (See: Accessories and Optional
Equipment/Cellular Phone/Communications Control Module/Service and Repair/Communication Interface Module Replacement).
6. Install the right closeout panel. Refer to Instrument Panel Insulator Panel Replacement - Right Side (See: Body and Frame/Interior Moulding /
Trim/Dashboard / Instrument Panel/Service and Repair).
7. Install the fuse labeled HVAC CTRL (BATT).