G6 V6-3.9L (2009)
4. Install the cable (1) into the inhibitor housing.
5. Attach the park lock cable to the shift control base. Ensure the park lock cable retainer (1) is fully secured to the shift control base.
6. Install the park lock cable on the park lock lever by sliding the cable end (2) over the park lock lever pin.
7. Turn the key to the LOCK position.
8. Inspect the functional operation of the park/lock cable. Refer to Park Lock Cable Adjustment (See: Adjustments/4T45-E - Automatic
Transmission).
9. Install the knee bolster. Refer to Knee Bolster Replacement (See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument
Panel/Service and Repair).
10. Install the console. Refer to Console Replacement (See: Body and Frame/Interior Moulding / Trim/Console/Service and Repair).
11. Enable the supplemental inflatable restraint (SIR) system. Refer to SIR Disabling and Enabling (See: Body and Frame/Interior Moulding /
Trim/Dashboard / Instrument Panel/Air Bag(s) Arming and Disarming/Service and Repair).