Grand AM V6-3.4L VIN E (2001)
3. Connect the blue vacuum hose (1) and the green vacuum hose (2) to the defroster actuator.
4. Install the instrument panel (IP) carrier. Refer to Trim Pad Replacement - IP in Instrument Panel, Gauges and Console.
3. Connect the blue vacuum hose (1) and the green vacuum hose (2) to the defroster actuator.
4. Install the instrument panel (IP) carrier. Refer to Trim Pad Replacement - IP in Instrument Panel, Gauges and Console.