J2000/Sunbird V6-191 3.1L (1992)
9.
Install clamp retaining air intake duct to throttle body.
10.
Install PCV pipe retaining clamp.
11.
Connect mass air flow and MAT sensor leads.
12.
Install battery and left fender brace.
13.
Connect positive and negative battery cables, then air intake duct to air cleaner.