Vibe L4-1.8L VIN L (2003)
6. Fully deploy the module before disposal. If the module was replaced under warranty, fully deploy and dispose of the module after the required
retention period. Refer to Inflator Module Handling and Scrapping.
INSTALLATION PROCEDURE
1. Install the inflatable restraint I/P module (1).
2. Install the mounting fasteners (2,3) to the I/P module.
NOTE: Refer to Fastener Notice in Service Precautions.
Tighten
Tighten fasteners to 20 N.m (15 lb ft).
3. Connect the I/P module connector (1).