Vibe AWD L4-2.4L (2009)
5. Check for air leakage.
6. With the purge port (2) and air inlet port (3) closed, apply 19.6 kPa (2.81 psi) of pressurized air into the vent port, then confirm that pressure is
retained for 1 minute. If the result is not as specified, replace the charcoal canister assembly.
Installation Procedure