pontiac Workshop Repair Guides

Pontiac Workshop Service and Repair Manuals

Deployment Procedures|Page 5604 > < Deployment Procedures|Page 5602
Page 20
background image

8. Cut 2 4.6 m (15 ft) deployment wires from a 0.8 mm2 (18 gage) or thicker multi-strand wire. Use these wires to fabricate the driver deployment

harness.

9. Strip 13 mm (0.5 in) of insulation from both ends of the wires cut in the previous step.

10. Twist together 1 end from each of the wires in order to short the wires. Deployment wires shall remain shorted, and not connected to a power

source until you are ready to deploy the air bag.

11. Twist together 1 connector wire lead to one deployment wire (1). Secure the connection mechanically.
12. Bend the twisted connection (2) flat. Wrap the connection tightly and securely with electrical tape. The tape will also insulate the connection.
13. Secure the remaining connector wire lead (3) to the remaining deployment wire.
14. Connect the deployment harness to the side impact module - left connector.

Deployment Procedures|Page 5604 > < Deployment Procedures|Page 5602