porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Removal and Replacement|Page 1236 > < Removal and Replacement|Page 1234
Page 19
background image

33. Turn the engine 360° at the crankshaft and fix at the TDC mark. Check camshaft position of cylinder bank 4-6 using the adjusting gauge 9686.

Then turn a further 360° and check the camshaft position of cylinder bank 1-3.

Slot position of camshafts at overlap

Subsequent work for installing camshafts

1. Insert solenoid hydraulic valves and new gaskets for the spark-plug recesses. Fit new O-rings into both solenoid hydraulic valves and insert into

the bores in the cylinder head. Grease O-rings with Optimol MP3.

Gaskets for spark plug recess and solenoid hydraulic valves

2. Install cylinder head cover.
3. Fit oil suction pump (1-3) and tandem pump (4-6) with new, micro-self-locking Torx screws M6. Replace O-rings and grease with Optimol MP3.

-> Tightening torque: 10 Nm (7.5 ftlb.)

4. Fit new plastic cap dry on cylinder head. Tap in with a plastic hammer.
5. Fit ground strap to cylinder head 4-6 with Torx screw M8 x 20 and tighten. -> Tightening torque: 23 Nm (17 ftlb.)
6. Insert each ignition coil into its spark plug recess, fit two M6 x 25 Torx socket screws and tighten them. -> Tightening torque: 10 Nm (7.5 ftlb.)
7. Fit retainer plates and holders for the solenoid hydraulic valves. -> Tightening torque: 10 Nm (7.5 ftlb.)
8. Fit holder for rear muffler. Fit and tighten two Torx screws M8 x 30 intake side and two Torx screws M8 x 25 exhaust side. Fit cable plugs for

ignition coils and solenoid hydraulic valves, fixing cable in the sheetmetal clips. -> Tightening torque: 23 Nm (17 ftlb.)

9. Fit and tighten cover plate with two Torx screws M6 x 16. -> Tightening torque: 10 Nm (7.5 ftlb.)

10. Connect two cable plugs to the oil temperature switch for cylinder bank 4-6.

Removal and Replacement|Page 1236 > < Removal and Replacement|Page 1234