porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Voltage Regulator > < Diagram Information and Instructions|Page 3512
Page 3
background image

1. Fit generator into cooling fan housing.

Install generator.
Make sure the connections for terminal B+ and terminal D+ are positioned opposite the TDC line mark (located on the edge of the cooling fan
housing).

2. Fit fan wheel for generator cooling.

Apply a thin coat of Loctite 270 to generator shaft threads and tighten to 14 ±1 Nm (10 ±0.73 ft lb.).

3. Fit air guide shroud.

Apply grease to rubber grommet of generator wiring harness, e.g. Contifix tire assembly compound, to facilitate fitting of the air guide shroud. 
Push cutout of air guide shroud into rubber grommet and and screw air guide shroud into place using 4 fastening nuts.

4. Reconnect ground cable.

Locate ground cable on studs provided on crankcase and tighten to 23 Nm (17 ft lb.).

Align cooling fan housing with crankcase.
Place cooling fan housing onto locating pin on crankcase.
Push cooling fan housing up to the stop (in direction of travel) and tighten retaining strap at the same time.

Note:  When the generator is fitted correctly, the wiring harness must exit from the air guide shroud towards the right (in direction of travel)!

Voltage Regulator > < Diagram Information and Instructions|Page 3512