porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Removal and Replacement|Page 1093 > < Removal and Replacement|Page 1091
Page 8
background image

9. Cylinder bank 4 - 6 Unscrew guide rail screw M6 on pulley side (hexagon socket a/f 5).

10. Unscrew four Torx screws for exhaust camshaft sprocket. Lift timing chain off sprocket and remove the sprocket. Lay timing chain on the

mounting tab for the sprocket.

11. Remove the four camshaft thrust bearings and the guide rail. Unscrew eight Torx screws, six M6 x 35, two M6 x 40 (screws for guide rail). Lift the

thrust bearing and the guide rail carefully off the mounting points or timing chain.

12. Remove the camshafts. Remove exhaust camshaft, lift timing chain off the camshaft adjuster of the inlet camshaft and remove the camshaft. Lay

the timing chain in the chain housing in the cylinder head.

Installing camshaft - engine removed

Installing camshafts, adjusting timing - engine removed

Caution: Risk of damage due to particles of dirt.
^

Danger of material damage due to blocked oil bores/oil ducts.

-> Absolute cleanliness is essential when working on the engine.
-> Lay removed engine parts on a clean base and make sure to cover them.
-> Use the cover for dust protection when fitting the engine NR.165 on the engine assembly support.

Identification of housings of camshafts:

Removal and Replacement|Page 1093 > < Removal and Replacement|Page 1091