porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Engine Controls - Performance Kit Installation|Page 1556 > < Engine Controls - Performance Kit Installation|Page 1554
Page 2
background image

1. Loosen threaded flange joint to catalytic converter -1-. Replace lock nuts.

2. Unscrew hexagon-head bolts (M8 x 26) -1- on exhaust manifold and remove manifold. Replace bolts.
3. Remove exhaust manifold seal and carefully clean sealing surfaces on the cylinder head and manifold.
4. Check exhaust manifold for damage and cracks.

Installing exhaust manifold

1. Position new metal seal on cylinder head. The beading must point to the sealing surface of the cylinder head.

INFORMATION:  Observe installation position of three-hole flange seal. The beading is facing the exhaust manifold and the edges must not project
over the contour of the flange.

2. Insert exhaust manifold on catalytic converter flange with a new seal and secure evenly to the cylinder head with two new screws. Then screw in

the remaining (new) screws. Observe installation position of seal on catalytic converter flange.

3. Fit three new lock nuts on catalytic converter flange and screw on slightly.

Engine Controls - Performance Kit Installation|Page 1556 > < Engine Controls - Performance Kit Installation|Page 1554