porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Removing and Installing Power Distributor|Page 3049 > < Removing and Installing Power Distributor|Page 3047
Page 4
background image

7. Screw down power distributor with the two fastening screws -2-. Tightening torque: 11 ftlb.
8. Push the B+ of the battery onto the mounting point as far as the stop. Check that the B+ line sits firmly.

Subsequent work

Subsequent work for power distributor

Connect the battery and carry out "Work instructions after disconnecting the battery".

Removing and Installing Power Distributor|Page 3049 > < Removing and Installing Power Distributor|Page 3047