porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Valve Clearance|Specifications|Page 972 > < Valve Clearance|Specifications|Page 970
Page 2
background image

Cylinder Designation

Adjusting 

1. Remove hot air ducts between fan and heat exchangers as well as cover for camshaft housing.
2. If adjustments are started with cylinder no.1 turn crankshaft on pulley clockwise until both valves of cylinder are closed (valves of cylinder no.4

overlap) and TDC mark (Z1) on pulley is aligned with joint of crankcase or stripe on fan housing.

Valve Clearance|Specifications|Page 972 > < Valve Clearance|Specifications|Page 970