porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 1450 > < Procedures|Page 1448
Page 10
background image

-

A:  Holder for camshaft adjustment valve

-

B:  Holder for valve lift adjustment valve

Cover for magnetic hydraulic valves in installation position with integrated seal

-

1:  Camshaft adjustment valve (control chain side)

-

2:  Valve lift adjustment valve

Tightening torque:  10 Nm (7.5 ftlb.)

14. Install ground strap on cylinder head. Position and tighten M8 x 20 hexagon-head bolt.

Tightening torque:  23 Nm (17 ftlb.)

15. Install ignition coils. Insert three ignition coils in the spark-plug recesses, position and then tighten two M6 x 25 hexagon socket head bolts.

Tightening torque:  10 Nm (7.5 ftlb.)

16. Install holder for the main muffler. Insert holder from the belt pulley side, position two M8 x 30 hexagon-head bolts at the top and two M8 x

25 hexagon-head bolts at the bottom and tighten. Connect the electrical plug of ignition coil cylinder 5 and the two electrical plugs of the
magnetic hydraulic valves, then fasten the cable in the sheetmetal brackets.

Tightening torque:  23 Nm (17 ftlb.)

17. Install the shield. Insert the shield, position and tighten the two M6 x 16 hexagon-head bolts.

Tightening torque:  10 Nm (7.5 ftlb.)

18. Connect the two cable plugs on the oil temperature switch.
19. Turn the engine at the assembly support by approx. 90 degree until the engine is horizontal (intake system at the top).

Installing Camshafts - Cylinder Bank 1 - 3

Procedures|Page 1450 > < Procedures|Page 1448