porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Removing and Installing Power Distributor|Page 2802 > < Removing and Installing Power Distributor|Page 2800
Page 3
background image

8. Mark the connection leads to the relevant fuse element.
9. Unscrew the fastening nuts -1-, remove the washer -2- and take out the fuse element -3-.

10. Unscrew fastening nut for the B+ line and remove the power distributor.

Installing power distributor

Installing the current distributor

1. Position the fuse elements -3- in the power distributor in accordance with the wiring diagram and position the marked connection leads in turn, fit

the washer -2- and tighten with the fastening nuts -1-. - Tightening torque: 6 ftlb. - Tightening torque: 11 ftlb.

2. Position the B+ line on the power distributor and tighten with the fastening screws. - Tightening torque: 11 ftlb.

INFORMATION:  If a new power distributor needs to be installed or a fuse element replaced, then a new cover for the fuse elements (blue) and a
new seal label (red) must be fitted. The spare parts are summarised in the PET as a package.

3. Insert the blue cover in power distributor and clip in place.

Removing and Installing Power Distributor|Page 2802 > < Removing and Installing Power Distributor|Page 2800