911 GT2 (996) F6-3.6L Turbo (2003)
1. Fasten sender with new sealing ring. Counter with a second wrench when doing this. Push on the electrical plug.
Sender tightening torque: 30 Nm (22 ftlb.)
2. Install oil temperature sensor with new sealing ring.
3. Check throttle sealing ring and replace it if necessary. Fasten throttle body. Push on the electrical plug.
4. Install pressure pipe. Wet the connecting hoses between the charge air coolers and pressure pipe with water at the connecting points and fit the
hoses. The hoses must audibly engage. Then recheck whether they are positioned properly by tilting and pulling on them.