911 Targa (996) F6-3.6L (2004)
1. Wrap the hydraulic lines once round the support of the frame for the roll-over bar. Fix the lines with a tie wrap -arrow-.
2. The lines must be connected to the pump without tension and twisting. Observe allocation of hydraulic lines! -Blue, red-
Tightening torques