porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

General Module|Service Precautions|CDR23|Page 54 > < PCM2 Gateway Connector Assignment|Page 51
Page 1
background image

General Module: Service Precautions
CDR23

CDR23

General instructions/safety instructions

The following points must be observed during vehicle diagnosis:

-

After the battery is connected, volatile memories must be reprogrammed. In the case of radio coding and tuning, the customer must be informed of
decoding and the deleted tuner memory.

-

After the battery has been connected, the instructions in the assembly Refer to Work instructions after disconnecting the battery must be observed.

-

Deactivate the traffic broadcast TP ON before beginning the diagnosis on CDR23. If this is not done, the system will crash (only for software
version < 03).

-

When working on the optical waveguide, please observe the instructions in assembly Refer to Optical waveguide - MOST bus.

-

After troubleshooting or repairs, erase the fault memory with the Porsche System Tester II 9588 and carry out a test drive.

-

After the test drive, read out the fault memory with the Porsche System Tester II 9588 again.

DANGER:
-

Danger of injury through triggering of driver's airbag

-

Never hang the Porsche System Tester II 9588 over the steering wheel.

CAUTION
-

Danger of damage due to improper handling of the battery and the control module connectors.

-

Never disconnect battery with engine running.

-

Never start engine without securely connected battery.

-

Never pull off or push on plug connections for the control modules or other electronic components when the ignition is switched on.

General Module|Service Precautions|CDR23|Page 54 > < PCM2 Gateway Connector Assignment|Page 51