porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Removing and Installing Relay Carrier 1|Page 3041 > < Removing and Installing Relay Carrier 1|Page 3039
Page 1
background image

Relay Box: Service and Repair
Removing and Installing Relay Carrier

Removing And Installing Relay Carrier

Technical values

Preliminary work

Preliminary work for relay carrier

Remove subwoofer for BOSE sound system, I No. 680.
Lift carpet lining behind backrest and remove.

Removing relay carrier

1. Unscrew the four fastening screws -4- and the fastening nut -5- and lift the retaining brackets for the DME control module and the relay carrier.

Removing and Installing Relay Carrier 1|Page 3041 > < Removing and Installing Relay Carrier 1|Page 3039