porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 3078 > < Procedures|Page 3076
Page 24
background image

4. Push on connector for fuel level sender -40- -Arrow A- and lock -Arrow B-.

5. Position battery retaining bracket and secure with the four fastening nuts.

-

Tightening torque: 10 Nm (7.5 ftlb.)

6. Push on connector for alarm horn -39- until it is felt to engage.
7. Push on connector for wiper motor -38- until it is felt to engage.

INFORMATION:  Only for vehicles with TPM.

8. Push connector onto front angle sensor for headlight beam adjustment -34- until it is felt to engage.
9. Push on connectors for windscreen washer system spray nozzle, left and right -32 and 33- until they are felt to engage.

10. Connect plug connections for PASM, front left and right -30 and 31- until they are felt to engage.
11. Push B+ line -29- onto mounting point at the power distributor as far as the stop. Check B+ line sits firmly.

INFORMATION:  Only for vehicles with I number 536

12. Push on connector for alarm siren -28- until it is felt to engage.
13. Push on connector for pressure switch -27- until it is felt to engage.
14. Push on connector of vertical sensor -26- until it is felt to engage.
15. Push on connector for radio antenna -25- until it felt to engage.
16. Push on connector for GPS antenna -24- until it is felt to engage.

Procedures|Page 3078 > < Procedures|Page 3076