porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 3101 > < Procedures|Page 3099
Page 47
background image

5.1. Insert B+ line into the box and tighten with the fastening nut -Arrow A-.

- Tightening torque: 23 Nm (17 ftlb.)

5.2. Close box for B+ line on transmission -Arrow B-.

6. Fasten B+ lead -3- at centre tunnel.

6.1. Push B+ line under the carpet in the direction of travel.
6.2. Insert B+ line into the two holders -arrows-.

7. Clip in B+ line -3- at unit carrier.

7.1. Push B+ line through the unit carrier and across the footwell air vent.
7.2. Clip in B+ line -arrow- at unit carrier with the retaining clip.

8. Clip in B+ line -3- at heater/air-conditioning unit.

8.1. Secure the B+ line to the main wire harness with the two new tie-wraps.
8.2. Clip in B+ line at heater/air-conditioning unit with the tie-wraps.

Installing B+ line from starter to transmission connection point

Procedures|Page 3101 > < Procedures|Page 3099