911 Targa 4S (997) F6-3.8L (2007)
5.1. Insert B+ line into the box and tighten with the fastening nut -Arrow A-.
- Tightening torque: 23 Nm (17 ftlb.)
5.2. Close box for B+ line on transmission -Arrow B-.
6. Fasten B+ lead -3- at centre tunnel.
6.1. Push B+ line under the carpet in the direction of travel.
6.2. Insert B+ line into the two holders -arrows-.
7. Clip in B+ line -3- at unit carrier.
7.1. Push B+ line through the unit carrier and across the footwell air vent.
7.2. Clip in B+ line -arrow- at unit carrier with the retaining clip.
8. Clip in B+ line -3- at heater/air-conditioning unit.
8.1. Secure the B+ line to the main wire harness with the two new tie-wraps.
8.2. Clip in B+ line at heater/air-conditioning unit with the tie-wraps.
Installing B+ line from starter to transmission connection point