911 Turbo AWD F6-3600cc 3.6L SOHC Twin Turbo (1997)
Removal Notes
NOTE: Parts No. 1 to 30 are removed with the tensioning plate remaining fitted.
Installation Notes
1. Using a suitable flat iron bar, clamp tensioning plate in a vise in such a manner that the hole for the shift rod locks is horizontal.
2. Check synchromesh of 1st and 2nd gears.
-
To do so, place friction ring, tapered ring and synchronizing ring in correct position onto gearwheel.
-
Check gap "A" with a feeler gauge.
Installation dimension:
New: 1.5 to 2.0 mm
Wear limit: 1.2 mm