porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Parking Assist Control Module > < Navigation System - New Navigation Drive Unit|Page 165
Page 2
background image

3. Disconnect electrical plug connections from the display and operator control unit.

Installing Display And Operator Control Unit (PCM)

NOTE:  After installation of a new display and operator control unit, the system must be activated with the Porsche System Tester 2.

1. Engage the electrical plug connections and carefully lay the electrical leads (do not pinch).
2. Connect and switch on the Porsche System Tester 2.

-

Connecting And Switching On The Porsche System Tester 2
1. Switch ignition on.
2. Switch on PCM by pressing the volume control (display remains dark).
3. Establish communication with the Porsche System Tester 2 and select PCM.
4. Select Modify coding.
5. Select PCM active.
6. Confirm PCM active with the F8 key.

-

Device Code Input
The display and operator control unit is protected against theft by a device code. Furthermore, a code also protects the navigation unit against
unauthorised users.

NOTE:
-

Both codes must be input when the system is commissioned.

-

Input the device code for the display and operator control unit first.

-

Only the navigation code has to be input again if the navigation unit is exchanged.

Parking Assist Control Module > < Navigation System - New Navigation Drive Unit|Page 165