porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Removing and Installing Electrohydraulic Control Unit|Page 1853 > < Removing and Installing Electrohydraulic Control Unit|Page 1851
Page 8
background image

7. Install the holder for water hoses. It is essential that the centering pin engages in the holder bore. Tighten the fastening screw.

Tightening torque: 10 Nm (7.5 ft. lbs.).

8. Install the coolant hoses with hose holders in the correct position.
9. Push vacuum pipe onto switch-over valve.

10. Fill in ATF. => Page 201 'Checking and topping up the ATF'

Removing and Installing Electrohydraulic Control Unit|Page 1853 > < Removing and Installing Electrohydraulic Control Unit|Page 1851