porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Removing and Installing Power Distributor|Page 2805 > < Removing and Installing Power Distributor|Page 2803
Page 3
background image

1. Position the fuse elements -3- in the power distributor in accordance with the wiring diagram and position the marked connection leads in turn, fit

the washer -2- and tighten with the fastening nuts -1-. - Tightening torque: 6 ftlb. - Tightening torque: 11 ftlb.

2. Position the B+ line on the power distributor and tighten with the fastening screws. - Tightening torque: 11 ftlb.

INFORMATION:  If a new power distributor needs to be installed or a fuse element replaced, then a new cover for the fuse elements (blue) and a
new seal label (red) must be fitted. The spare parts are summarized in the PET as a package.

3. Insert the blue cover in power distributor and clip in place.

4. Close the power distributor until the lid is felt to engage and seal with the red seal label.
5. Check the plastic seal on the power distributor for damage; replace it if in doubt.
6. Slide the power distributor upwards between the heater/air-conditioning unit and the bulkhead, and engage in the bulkhead.

7. Screw down power distributor with the two fastening screws -2-. - Tightening torque: 11 ftlb.
8. Push the B+ of the battery onto the mounting point as far as the stop. Check that the B+ line sits firmly.

Subsequent work

Subsequent work for power distributor

Connect the battery and carry out "Work instructions after disconnecting the battery".

Removing and Installing Power Distributor|Page 2805 > < Removing and Installing Power Distributor|Page 2803