porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Relay Box > < Removing and Installing Power Distributor|Page 2821
Page 3
background image

cannot be used.

WARNING:
Sudden voltage interruption of the power supply to the control module.
-

Destruction of the control module.
-

During programming, it is essential to guarantee the power supply for the Porsche System tester. It is essential to connect a battery
charger with a current rating of at least 40 A to the vehicle battery.

-

Prior to disconnecting the control module, switch off the ignition and remove the ignition key.

INFORMATION:
-

Follow the instructions on the Tester.

-

Later versions of the software may display slightly different text or require a slightly different procedure. The instructions you receive from the
tester itself take precedence over this description.

1. Connect the Porsche System Tester to the vehicle and start the System Tester. Switch on the ignition. >> Continue.
2. Select vehicle type using the cursor keys.
3. Using the >> key, move from the vehicle type to the list of control modules. Perform the automatic control module search.
4. Select the relevant control module with the cursor keys and press the >> key.
5. Select Control unit replacement with the cursor keys and press the >> key.
6. Select Write in data and write in the relevant data. (Even if no data was read out, the required data is loaded for the control unit.)
7. Select Coding with the cursor keys and press the >> key.
8. Select the version required for the vehicle in question and follow the instructions on the Tester.
9. In the menu Vehicle type, select Control units and then select the menu Special functions.

10. Perform Vehicle handover and follow the instructions of the Tester.
11. Read out and erase fault memory.

Relay Box > < Removing and Installing Power Distributor|Page 2821