porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Air Injection Control Valve|Service and Repair|Page 1739 > < Air Injection Control Valve|Service and Repair|Page 1737
Page 5
background image

1.1. Fit shut-off valve -1- with new O-ring and screw in and tighten M6 screws -2-. Connect hose.

Tightening torque: 10 Nm (7.5 ftlb.)

2. Install intake-air distributor 1-3.

3. Install oil-filter console.

4. Install secondary-air pump.

Air Injection Control Valve|Service and Repair|Page 1739 > < Air Injection Control Valve|Service and Repair|Page 1737