porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 2741 > < Procedures|Page 2739
Page 76
background image

1. Place socket in installation position -arrow A- and screw on the fastening nut. - Tightening torque: 10 Nm (7.5 ftlb.)
2. Plug in the two connectors -arrow B-.
3. Fold back the cable retainer -arrow C- until it engages correctly at the connectors.

4. Press the ABS wire harness into the supports by pressing on the rubber sleeves -arrows-.

5. Push the ABS wire harness inward -arrow-.

INFORMATION:  Only for vehicles with TPM.

6. Cut through the rubber sleeve -a- and insert the HBA line -arrow A-. Stick the rubber sleeve together at the cut edge -a- using a commercially

available PUR adhesive and seal. Press the rubber seal into the opening -arrow B-.

INFORMATION:
-

Select a place for the joint where there is enough space to join all the lines present.

-

Do not cut the lines too short in case they have to be laid in a different position if there is insufficient space in the area of the joint.

-

The greatest care must be used in the individual work steps for stripping insulation from, crimping, and shrinking/insulating the electric lines.

-

The procedure for stripping insulation from, crimping, and shrinking/insulating the electric lines must be complied with and observed. The
procedures are described in detail in the repair kit for harnesses NR.155-1.

-

Crimping samples are to be prepared before beginning work.

7. Crimp lines in area around -b-.

Procedures|Page 2741 > < Procedures|Page 2739