porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Convertible Top Frame|Service and Repair|Page 4363 > < Convertible Top Frame|Service and Repair|Page 4361
Page 7
background image

-

Strip 10 mm of insulation off the wires.

-

Connect wires with crimp connectors (do not confuse colours of the individual wires).

-

Shrink shrink-fit hoses with a hot-air gun. It is essential that all wires are watertight.

-

Wrap commercially available PVC tape all around the area of the connection points.

Installing potentiometer.

Installing tension strap

1. Installing tension strap on roof frame 1

Position tension strap -41- on roof frame 1 -11- and screw in with the fastening screws -42-.

Tightening torque: 5 Nm (3.5 ftlb.).

2. Installing tension strap on the main bow

Position tension strap -41- on main bow -14- on the holes provided, rivet on the tension strap -41- with the pop rivets -43- (parts scope component
of convertible-top covering)

3. Installing tension strap on the corner bow

Position tension strap -41- on corner bow -18- on the holes provided, rivet on the tension strap -41- with the pop rivets -43- (parts scope
component of convertible-top covering)

4. Installing tension strap on the tension bow

Position tension strap -41- on tension bow -21- on the holes provided, rivet on the tension strap -41- with the pop rivets -43- (parts scope
component of convertible-top covering)

Convertible Top Frame|Service and Repair|Page 4363 > < Convertible Top Frame|Service and Repair|Page 4361