porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Warm Up Regulator > < Turbo Breather Hose - Revised
Page 2
background image

locate and center punch for hole in center of cylinder head flange near No. 1 fuel injector (arrow)

drill a 13mm (1/2 inch) diameter hole

Caution:

To prevent shavings from getting inside engine, grease engine flange area before drilling, and coat drill bit with grease

remove rag and clean up shavings

reinstall valve cover

remove air cleaner upper and lower sections. Disconnect mixture control unit with lower section and lay aside; do this by unscrewing hexagon nuts
and removing dust cover and vent hose from oil separator on lower section. Do not unscrew fuel lines

cut off old vent hose on turbocharger such that approximately 60 mm of hose remains on adapter

bolt down end plate with gasket, washers and 8 x 20 bolts. The connecting tube must face up

push pipe onto piece of hose and secure with hose clamp 

push on foam rubber part 

push shaped hose onto pipe and connecting adapter 

install hose clamps 

remove old hose leading to branch on crankcase vent hose

plug opening in branch with an end cap, Part No.930 110 256 01

^  install hose clamp

reinstall mixture Control unit, making sure dust cover is positioned correctly

reinstall fuel lines at injectors

reinstall suction/pressure line

reinstall air cleaner

check engine idle speed and % off CO

Labor Operation: 10 52 34 0 
Time Allowance: 140 T.U.

Warm Up Regulator > < Turbo Breather Hose - Revised