porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

All Other Service Bulletins for Radiator:|18710 > < Tools - Oil Cooler Testing
Page 2
background image

7.

Holder - similar to item 4, 3/8 inch pipe thread to accept angle fitting.

8.

Angle fitting - 3/8 inch pipe thread to match holder, also threaded to accept schrader valve.

9.

Schrader valve.

Assemble the items as shown in Figure 3. Securely clamp the cooler in the fixture as shown in Figure 4. Pressurize the cooler to 5 bar with a regulated
shop air source. Submerge the assembly in clear water and check for visible air bubbles from the cooler matrix. After testing is complete, release any
residual pressure at the schrader valve prior to removal from tool P200a.

Use labor operation 17 40 19 0A for 25 TU.

All Other Service Bulletins for Radiator:|18710 > < Tools - Oil Cooler Testing