944 S L4-2479cc 2.5L DOHC (1987)
1. Set the control motors to the final "cool" position. To do this, connect pin 4 with + and pin 5 with - of a voltage source of 12 V.
2. Press temperature-mixing flap lever upward until the flap is at the stop. Clip on the linkage in this position.
3. Loosen nut M5 on baffle flap linkage.
4. Press together the two linkage halves and tighten nut M5.