porsche Workshop Repair Guides

Porsche 944 S L4-2479cc 25L DOHC Workshop Service and Repair Manuals

Air Flow Control Box - A/C|Page 4358 > < Component Locations|Page 4355
Page 1
background image

Housing Assembly HVAC: Service and Repair
Air Flow Control Box - A/C

1. Drain air-conditioning system.
2. Drain refrigerant.

3. Remove fresh air blower assembly.  See: Blower Motor/Service and Repair

4. Remove center console. See: Body and Frame/Interior Moulding / Trim/Console/Service and Repair

5. Remove instrument panel.  See: Instrument Panel, Gauges and Warning Indicators/Instrument Cluster / Carrier/Service and Repair

6. Unclip instrument-panel wiring harness.
7. Disconnect plug.
8. Disconnect plug at interior-sensor blower.
9. Pull out air ducts.

1O. Pull out drainage hose.

11. Unscrew A/C lines.
12. Remove vacuum lines.
13. Unscrew refrigerant hoses.
14. Unscrew fastening nuts on the outside (4 pcs.).

Air Flow Control Box - A/C|Page 4358 > < Component Locations|Page 4355